The Watercrest by Ellington
MBR (Mohammed Bin Rashid City District 7), Dubai
- Handover
- Q3 2027
- Payment Plan
- Contact for details
Need Live Support?





Villa
Q4 2026
The Lakeshore embodies the pinnacle of luxury living, showcasing exquisite design-led residences and inspirational spaces, nestled within a serene waterside community that harmoniously blends nature and sophistication, catering to the refined tastes of our discerning clients and... Read More
Immediately
60 days after the reservation date November 2023
120 days after the reservation date Janurary 2024
240 days after the reservation date May 2024
360 days after the reservation date September 2024
450 days after the reservation date Deccember 2024
540 days after the reservation date March 2025
720 days after the reservation date September 2025
900 days after the reservation date March 2026
On completion


The approach towards the interior spaces is multisensory and holistic , where the materiality of each space contributes to that concept . Bathed in natural light , the interior spaces are curated to impress and showcase exceptional materials and craftsmanship . The mixture of raw finishes ... Read More
United Arab Emirates
2014
30
8
6930
Founded in 2014, Ellington Properties is Dubai’s leading des... Read More
16th and 17th floor, Burlington Tower, Business Bay, Dubai, UAE
* Developer information is for reference only and may change. Please contact the developer for the latest details.
Handover for The Lakeshore is planned for Q4 2026.
Prices at The Lakeshore start from AED 12.92 M.
The Lakeshore offers a 20/50/30 payment plan (20% Immediately; 10% 60 days after the reservation date November 2023; 10% 120 days after the reservation date Janurary 2024; 5% 240 days after the reservation date May 2024; 5% 360 days after the reservation date September 2024; 5% 450 days after the reservation date Deccember 2024; 5% 540 days after the reservation date March 2025; 5% 720 days after the reservation date September 2025; 5% 900 days after the reservation date March 2026; 30% On completion).
The Lakeshore is developed by Ellington. Ellington has 30 completed projects and 8 off-plan projects in development.
The Lakeshore is located in Al Barari, Dubai.
Residents at The Lakeshore have access to Near Mall, Near the beach, Private beach, Private Pool, Can with animals, Near Airport, Stores in the house, Restaurant, and 13 more.
Dubai International Airport is 27.1 km away (about 43 min by car). واحة دبي السيليكون metro station is 9.9 km away (about 18 min by car).
HLG Umar is 9.7 km away (about 18 min by car). Fakeeh University Hospital is 9.8 km away (about 18 min by car).
Kent College is 5.4 km away (about 14 min by car). Indian International School is 10.2 km away (about 19 min by car). Repton School Dubai is 14.5 km away (about 22 min by car).
Avenue mall is 12.5 km away (about 21 min by car). Nad Al Sheba Mall is 10.1 km away (about 20 min by car). Q1 Mall is 11.8 km away (about 22 min by car).
Calculate and view the monthly mortgage on this Project
MBR (Mohammed Bin Rashid City District 7), Dubai
Prop971 is your premier destination for navigating the dynamic world of UAE real estate. Since our founding, we've been committed to providing clarity and confidence to property seekers through cutting-edge technology and comprehensive market insights.
Need Live Support?
Prop971 is a UAE proptech platform operated by Prop971 Digital LLC.
Email: hello@prop971.com | Phone: +971 56 154 1481
Copyright © 2026 Prop971 Digital LLC. All rights reserved.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.


